I did a full home renovation before moving into my new family home. Cost me around £85k out of pocket at the moment (ie life savings) It would have been the best decision of my life, had I picked the correct builder. Instead, I'm spiralling into depression due to the project never ending and other really stressful life events at the same time, whilst trying to work and look after 2 very young kids and patchwork the builders mistakes. Things he has done:
- projected time for completion was 8 weeks. We are now 7 months and not completed without building control approval
- tried to fit non compliant lights in the whole house, but did correct this after I noticed it
- installed a steel beam in the incorrect place, so had to take up excessive flooring which affected the foam underfloor insulation
- cat5e ethernet cables not giving full speeds (100mbps instead of 1gbps) are wired into the house
- loft ladder not assembled correctly. Visible damage to one of the springs but he says it's fine. Initially was installed dangerously, but loft boarding specialist called him out on it.
- ONGOING central heating leak which has developed over the last 2 weeks so no hot water or heating. supposedly a new central heating system, but his plumber has told me that the old pipes remain in place. No idea where the leak is. He has tried putting CH leak sealant which has not worked. How do I check if he has replaced the pipes now that flooring is in??
- laminate flooring for the entire upstairs is installed on uneven floorboards, with visible gaps and creaking in the new boards due to the unevenness.
- downstairs heaters do not meet the btu requirements of the space and so cannot heat effectively
- replaced a toilet without moving the waste pipe, so a gap in the back of the toilet because he couldn't be bothered to move the waste pipe
- did not install screw covers in sockets and switches
- did not install screw covers in the entire kitchen cabinets (drawer, integrated fridge etc) handed me them in a bag
- tried to put cardboard under the laminate flooring to even it out, and said he would not do that after I called him out on it. A week later caught him doing the same thing again
- installed the shower control panel upside down, then when I got him to fix it he threw out the shower control screw covers. Told me they were never there when I called him out on it. No idea how to get those parts now.
- installed the bidet lever upside down on 3 toilets
- poured waste material in the gutter (grout and such) which blocked it. When I brought a specialist drain unblocker he showed me the waste. Our builder denies it was him. Permanent fix would be £850 but he temporarily fixed it for £100
- one day came to find the extractor fan in the bathroom swapped out to a louder one for no apparent reason