Hi All,
Struggling to find a plumber, so tackling this myself. This is a new install (single storey) so will need waste piping all way to the exiting septic tank. Would like to run a few things by you..
Would a 'stub stack' the way forward with this? With boss pipe for the x2 40mm wastes then a branch for the toilet? (with 1:40 slopes on all)
The toilet will be nearer to the tank than the shower but to save on complex piping and a cleaner install I'm thinking it is better to site the stack directly behind the toilet?
Struggling to find a plumber, so tackling this myself. This is a new install (single storey) so will need waste piping all way to the exiting septic tank. Would like to run a few things by you..
Would a 'stub stack' the way forward with this? With boss pipe for the x2 40mm wastes then a branch for the toilet? (with 1:40 slopes on all)
The toilet will be nearer to the tank than the shower but to save on complex piping and a cleaner install I'm thinking it is better to site the stack directly behind the toilet?