Hi all. I had Bristol water over today to assess my lead replacement. Our water supply is shared with the neighbours (possibly 2 other houses) and is connected in front of their front garden (victorian terrace). Bristol water said we would only qualify for the free connection if we brought the MDPE pipe to within a meter of the old lead connection. Not possible without digging a trench through our garden and also the neighbours. Or we have to pay to have a new connection put in outside ours. We are only getting 6 L/min and want to upgrade out back boiler to a combi hence the new water supply. Has anyone had this issue and solved it?