- Joined
- 14 Feb 2016
- Messages
- 2
- Reaction score
- 0
- Country
Hi all, this is my first post, so I hope this is the right place...
We live in a detached 3 bed with a garage alonside but set about 6ft back from the house (the back of the garage is level with the back of the house)
I was thinking of extending the garage forward and bring it slightly past the front of the house and having the roof of the garage extend to act as a porch as well. See image for a better explanation of what I am trying to describe.
I've got a few questions as I've never organised anything like this before.
Am I likely to need planning permission for this?
If so, what is the usual order people go through for this type of work? For example I would assume it's something like:
1) contact planning office to arrange a visit to check if planning permission is definitely needed
2) contact builders to obtain quotes
3) confirm no objections from neighbour (on that side of house)
4) apply for planning permission
5) agree with builder to start work
Is that the right order to proceed with the this?
Thanks in advance for the help, as I said, I'm very new to this, so forgive me if any of this should be very obvious!
We live in a detached 3 bed with a garage alonside but set about 6ft back from the house (the back of the garage is level with the back of the house)
I was thinking of extending the garage forward and bring it slightly past the front of the house and having the roof of the garage extend to act as a porch as well. See image for a better explanation of what I am trying to describe.
I've got a few questions as I've never organised anything like this before.
Am I likely to need planning permission for this?
If so, what is the usual order people go through for this type of work? For example I would assume it's something like:
1) contact planning office to arrange a visit to check if planning permission is definitely needed
2) contact builders to obtain quotes
3) confirm no objections from neighbour (on that side of house)
4) apply for planning permission
5) agree with builder to start work
Is that the right order to proceed with the this?
Thanks in advance for the help, as I said, I'm very new to this, so forgive me if any of this should be very obvious!