Hello,
Last summer we had a single storey extension to the rear of the house. The builders have done a fantastic job, really pleased with the finish, the space we’ve gained and our new kitchen (really recommend a Quooker tap!).
Unfortunately for us, the budget ran out (thanks inflation) before we could include getting the garden/new patio in the build but as I’m reasonably DIY competent I fancy having a go at doing this myself. The plan is; sleeper wall edging (the patio will sit about 30cm lower than the rest of the lawn and garden), stone pavers laid on cement on top of hardcore base.
I’ve dug out the space (roughly 5m x 3.5) and I’m just about ready to start putting down hardcore etc. and having read a bit onlineabout building regs and needing 150mm gap from DPC height, I’m left with a question. If I laid 100mm channel drains along the wall of the house, feeding into existing drainage, would 75mm gap to DPC be allowable or not?
I ask because my reading suggests this might be allowed as the paving isn’t directly against the wall but want to make sure, otherwise I best get the spade out again!
Thanks in advance
Last summer we had a single storey extension to the rear of the house. The builders have done a fantastic job, really pleased with the finish, the space we’ve gained and our new kitchen (really recommend a Quooker tap!).
Unfortunately for us, the budget ran out (thanks inflation) before we could include getting the garden/new patio in the build but as I’m reasonably DIY competent I fancy having a go at doing this myself. The plan is; sleeper wall edging (the patio will sit about 30cm lower than the rest of the lawn and garden), stone pavers laid on cement on top of hardcore base.
I’ve dug out the space (roughly 5m x 3.5) and I’m just about ready to start putting down hardcore etc. and having read a bit onlineabout building regs and needing 150mm gap from DPC height, I’m left with a question. If I laid 100mm channel drains along the wall of the house, feeding into existing drainage, would 75mm gap to DPC be allowable or not?
I ask because my reading suggests this might be allowed as the paving isn’t directly against the wall but want to make sure, otherwise I best get the spade out again!
Thanks in advance