Hello,
I’m going to be laying porcelain paving in my new build garden shortly. At the moment the garden is just the soil that was dumped and levelled out by the builder after construction was complete.
I had a new build previously and last time when I did the garden I dug out back to the clay which was approx 300mm down and then filled with type 1.
My question is do I need to dig out all the soil back to the clay again or can I just dig say 150mm out and then compact type 1 on top. I live in SE England and type 1 is about £50 a ton so looking to keep costs down if I can but don’t want my patio sinking. All the info online seems to point towards only needing 100-200 sub base for a patio but I’m not sure on laying type 1 over top soil.
Thanks
Paul
I’m going to be laying porcelain paving in my new build garden shortly. At the moment the garden is just the soil that was dumped and levelled out by the builder after construction was complete.
I had a new build previously and last time when I did the garden I dug out back to the clay which was approx 300mm down and then filled with type 1.
My question is do I need to dig out all the soil back to the clay again or can I just dig say 150mm out and then compact type 1 on top. I live in SE England and type 1 is about £50 a ton so looking to keep costs down if I can but don’t want my patio sinking. All the info online seems to point towards only needing 100-200 sub base for a patio but I’m not sure on laying type 1 over top soil.
Thanks
Paul