Hi I had a patio done 6 months ago and it’s has been layer level with the dpc with an acco drain between wall and slabs, I am getting green walls at one part of the walls. Should the acco have been fitted much lower than the dpc? Also the drain doesn’t appear to slope into the outlet so it looks like water is sitting in it and now flowing.
Is this correct and if not what can I do?
Is this correct and if not what can I do?