In a previous discussion, the following design was determined as being within PD:
Would this design still be within PD if we flipped the new exteion around and had the eaves towards the centre of the plot like this?
(We were just thinking that this option may make the rainwater system easier to maintain...)
Thanks!
Would this design still be within PD if we flipped the new exteion around and had the eaves towards the centre of the plot like this?
(We were just thinking that this option may make the rainwater system easier to maintain...)
Thanks!