Pitch roof, loft trusses clarification. Can I remove or cut a trusses to introduce a beam

Joined
22 Nov 2019
Messages
623
Reaction score
12
Country
United Kingdom
Hi,

I was taking into consideration to remove my chimney breast and an engineer advised to run a beam between the front and rear wall.

After my survey, I got to the conclusion that I could run a 152x89 without lowering the ceiling at first floor but this can happen only If I can cut some joist as per the attached photos.

Can you also advise why I have cross trusses and if those can be cut or are part of the structure roof?

Maybe the photo will clarify what I'm trying to say as 2 of these have already been cut in the past and do not reach the other end.

Any help would be appreciated
 

Attachments

  • Roof 01.png
    Roof 01.png
    2.4 MB · Views: 633
  • Roof 02.png
    Roof 02.png
    2.5 MB · Views: 500
  • 20200413_113858.jpg
    20200413_113858.jpg
    311.1 KB · Views: 548
  • 20200413_113906.jpg
    20200413_113906.jpg
    311.1 KB · Views: 513
  • 20200413_113910.jpg
    20200413_113910.jpg
    327.3 KB · Views: 502
  • 20200413_113915.jpg
    20200413_113915.jpg
    327.7 KB · Views: 556
  • 20200413_113924.jpg
    20200413_113924.jpg
    89.8 KB · Views: 464
  • 20200413_113931.jpg
    20200413_113931.jpg
    192.4 KB · Views: 488
  • 20200413_113936.jpg
    20200413_113936.jpg
    255.2 KB · Views: 675
They're ceiling binders, they connect the ceiling joists together to stop them twisting. Tie it back in when you make good the hole in the ceiling where the chimney breast was.
 
They're ceiling binders, they connect the ceiling joists together to stop them twisting. Tie it back in when you make good the hole in the ceiling where the chimney breast was.

To have one flat floor. Would nothing between the joist work on the same way? Can I cut the blinder on the spot as per my sketch as the beam will be g
Higher than the blinder or actually will only need to cut 50mm as 100mm from the house and 50mm on the blinder. Can reinforce with a steel plate on both side. What do you think?
 
I have just removed the old laths and plaster ceiling and the ceiling joist condition is very bad with most of them worst than a banana. completely twisted. As I would like to use the loft for storage or even make a room in the future. I was thinking to use my chimney breast beam to support new 50x200 joist as per attached image.

My question is can joist been split and not connected to roof trusses or this is part or structure to help roof not to collapse

My idea is to completely remove binders as well and make a more clean flooring.


upload_2020-5-2_8-14-6.png
 
If there is a central / spine wall below then I don't see why you can't remove the binders and make a new floor, try to connect your new floor to your rafter feet and wall plate.
The two vertical pieces of timber are probably there to stop that collar twisting, so might be able to modify that.
 
I will attach more photos when ceiling completely exposed. Thanks
 
Here you photos and video
 

Attachments

  • 20200502_190922.jpg
    20200502_190922.jpg
    273.7 KB · Views: 341
  • 20200502_190929.jpg
    20200502_190929.jpg
    281.3 KB · Views: 938
  • 20200502_190857.jpg
    20200502_190857.jpg
    291 KB · Views: 394
  • 20200502_190925.jpg
    20200502_190925.jpg
    265.6 KB · Views: 368
  • 20200502_190852.jpg
    20200502_190852.jpg
    262.6 KB · Views: 391
  • 20200502_191204.jpg
    20200502_191204.jpg
    295.9 KB · Views: 542
  • 20200502_190903.jpg
    20200502_190903.jpg
    192.9 KB · Views: 371
  • 20200502_190901.jpg
    20200502_190901.jpg
    286.9 KB · Views: 454
  • 20200502_191220.jpg
    20200502_191220.jpg
    295.2 KB · Views: 307
  • 20200502_190910.jpg
    20200502_190910.jpg
    311.3 KB · Views: 379
More photos but not available to upload video
 

Attachments

  • 20200502_190857.jpg
    20200502_190857.jpg
    291 KB · Views: 280
  • 20200502_190852.jpg
    20200502_190852.jpg
    262.6 KB · Views: 291
  • 20200502_190903.jpg
    20200502_190903.jpg
    192.9 KB · Views: 277
  • 20200502_190901.jpg
    20200502_190901.jpg
    286.9 KB · Views: 298
  • 20200502_190910.jpg
    20200502_190910.jpg
    311.3 KB · Views: 315
  • 20200502_190909.jpg
    20200502_190909.jpg
    255.8 KB · Views: 338
  • 20200502_190913.jpg
    20200502_190913.jpg
    337.8 KB · Views: 319
  • 20200502_190911.jpg
    20200502_190911.jpg
    346.4 KB · Views: 355
  • 20200502_190850.jpg
    20200502_190850.jpg
    305.6 KB · Views: 362
More photos from below
 

Attachments

  • 20200503_123028.jpg
    20200503_123028.jpg
    325.1 KB · Views: 317
  • 20200503_123026.jpg
    20200503_123026.jpg
    242.5 KB · Views: 313
  • 20200503_122937.jpg
    20200503_122937.jpg
    268 KB · Views: 293
  • 20200503_123040.jpg
    20200503_123040.jpg
    274.5 KB · Views: 336
  • 20200503_123039.jpg
    20200503_123039.jpg
    269.5 KB · Views: 281
  • 20200503_123008.jpg
    20200503_123008.jpg
    232.1 KB · Views: 301
  • 20200503_123013.jpg
    20200503_123013.jpg
    324.1 KB · Views: 350
  • 20200503_123010.jpg
    20200503_123010.jpg
    286.6 KB · Views: 330
  • 20200503_122934.jpg
    20200503_122934.jpg
    259.3 KB · Views: 325
  • 20200503_123018.jpg
    20200503_123018.jpg
    250 KB · Views: 318
As said, cut the ceiling binder and reattach it to the new steel beam. All you need is to fill out the webs with timber then use a hanger or angle brackets. Drill a couple of holes in the web before offering it up.
Or just ignore that binder and fit a new one directly into the web.
 
Last edited:
As said, cut the ceiling binder and reattach it to the new steel beam. All you need is to fill out the webs with timber then use a hanger or angle brackets. Drill a couple of holes in the web before offering it up.
Or just ignore that binder and fit a new one directly into the web.


I may not have expressed myself very well. On the sketch above the 2 blue line are 152x89 beams which has been designed to support the chimney stuck and the original design was to crank the ends to sit the beam just above the binders. As I have now remove the old ceiling and just realised how in bad shape the ceiling joist are, I was thinking to replace the old 50*100 joist with a 50x200 joists which would make my loft floor much more stronger and in the future could use it as workshop or deposit. Now my question is. Are these ceiling joist and binder part of the roof structure which keep the roof together avoiding it to open and collapse or can I remove the old one. and install the beam without any crank but just flat on top of the stud wall and connect the new joist at right and left side of the beam without any binders?
 
I may not have expressed myself very well. On the sketch above the 2 blue line are 152x89 beams which has been designed to support the chimney stuck and the original design was to crank the ends to sit the beam just above the binders. As I have now remove the old ceiling and just realised how in bad shape the ceiling joist are, I was thinking to replace the old 50*100 joist with a 50x200 joists which would make my loft floor much more stronger and in the future could use it as workshop or deposit. Now my question is. Are these ceiling joist and binder part of the roof structure which keep the roof together avoiding it to open and collapse or can I remove the old one. and install the beam without any crank but just flat on top of the stud wall and connect the new joist at right and left side of the beam without any binders?
A ceiling binder won't be necessary with deeper full spec' joists, no.
 
The ceiling joists effectively tie together the feet of the rafters on opposite sides of the roof to make a triangular structure.

You can replace the ceiling joists with deeper 8x2s which - as well as tying the rafter feet - would also form your new floor. BUT, if the new joists are split by the 152 x 89, they will not be as effective at tying the rafter feet together and the roof might spread long-term.