I am installing a shower into what was once an airing cupboard in the bathroom. I have put stud walling up and I going to fix to this 9.5mm plaster board.
Is it necessary to skim plaster this before the tills are fitted or can I fix the tills to the plaster board.
Thanks
CliveB
Is it necessary to skim plaster this before the tills are fitted or can I fix the tills to the plaster board.
Thanks
CliveB