- Joined
- 23 Nov 2017
- Messages
- 45
- Reaction score
- 0
- Country
Quick question to any paving experts out there.
I have laid a new sandstone slab patio on a semi dry mix of sand and cement (6:1). I used the guide from the paving expert website (laying flags).
I'm just wondering how long it takes to set and how long to wait before pointing it?
I have laid a new sandstone slab patio on a semi dry mix of sand and cement (6:1). I used the guide from the paving expert website (laying flags).
I'm just wondering how long it takes to set and how long to wait before pointing it?
- If too soon does it not have proper chance to absorb moisture from between the paving?