Hi All,
We have had someone round to check an opening for PVCu doors and he recommended we take the course of bricks down a level. The builder has responded that he can’t go down a course of bricks as this would mean he is below the damp course of the building. However, this means there is a (small) step up to the bring from the screed to the brick before the doors would be installed making the step over even higher. If we took it down a brick the step over would be less of a trip hazard, so we would like to take it down a layer if possible.
Taking down a course of bricks would still leave a layer of brick and the DPC under the insulation and screed would still be below that...
Where is the damp course on a victorian build? I am wondering if this is for Building Control, or if the builder trying to avoid work? We are happy to take the course down ourselves with an SDS drill! Alternatively, is there a way to install half-height bricks to bring it flush with the screed level?
There is also a gap that has been left between the screed and the brick wall that the doors will sit on.
Any help/advice would be great.
We have had someone round to check an opening for PVCu doors and he recommended we take the course of bricks down a level. The builder has responded that he can’t go down a course of bricks as this would mean he is below the damp course of the building. However, this means there is a (small) step up to the bring from the screed to the brick before the doors would be installed making the step over even higher. If we took it down a brick the step over would be less of a trip hazard, so we would like to take it down a layer if possible.
Taking down a course of bricks would still leave a layer of brick and the DPC under the insulation and screed would still be below that...
Where is the damp course on a victorian build? I am wondering if this is for Building Control, or if the builder trying to avoid work? We are happy to take the course down ourselves with an SDS drill! Alternatively, is there a way to install half-height bricks to bring it flush with the screed level?
There is also a gap that has been left between the screed and the brick wall that the doors will sit on.
Any help/advice would be great.