Your looking for the voltage on the pirs lol. Do you have the engineer code? If you dont know what your doing probably better off getting a decent local firm in to take a look rather than a 1 man band who does it on the side.
What’s being an electrician got to do with anything ? If he works for a big commercial alarm company then he should know about how much current is available on this system , you would be normally looking at a powered zem8 if you where adding extra devicesWhat will be the solution.
I must admit I am giving hope with my installer. 1st he wanted to charge me callout fee as its 8 weeks from installation.
And on multiple occasions he said he is not electrician. He works for big commercial alarm company and does domestic installation as side job. Until problem all was OK. He has 100% reviews on chechatrade and mubuilder.
No whole kit is brand new. Only thing which is old is wire which runs from panel to wired pirs.You mentioned the enforcer V11 was brand new, was this an upgrade from an older system, the PIRs that are wired, are they from an older system