Just got a quote in to dig a 150m trench 800mm deep. including within 2m of 3 mature trees and tarmac repair over about 8m.
£6750++
was thinking man and a digger £200 a day plus £100 for som tarmac.
Tops £1500 for the job, not £8100.
Am I in sky cuckoo land???
£6750++
was thinking man and a digger £200 a day plus £100 for som tarmac.
Tops £1500 for the job, not £8100.
Am I in sky cuckoo land???