1) Any idea what “bonding required before first tee” means?
this was written on my gas safety certificate (CP-12).
I have tried to look it up and I think it is something to do with a plumbing joint (for a radiator?). Does a plumber need to do this?
2) radiator valve leaking. Does this mean I need a new Valve? Can I replace this myself, or do I need a plumber?
Thank you
this was written on my gas safety certificate (CP-12).
I have tried to look it up and I think it is something to do with a plumbing joint (for a radiator?). Does a plumber need to do this?
2) radiator valve leaking. Does this mean I need a new Valve? Can I replace this myself, or do I need a plumber?
Thank you