I have an estimate to supply & fit a new Baxi Duotec 33 combi boiler to replace my old conventional boiler. I wonder if someone could have a look and let me know if this sounds fair?
- Drain and remove old boiler
- Alter pipework to suit
- Remove HW Cylinder
- Upgrade gas supply to 22mmm pipe
- Supply ansd fit Adey Magna-clean filter
- Supply and fit Hive room stat
- Install condensate internal where possible
- Flush system with chemicals
- Add inhibitor on completion