My patio has seen better days and it looks like a good time to replace it. When it comes to replacing patio, is it ok to leave the existing hardcore and put down a new full bed of mortar for laying the new slabs? Or is it necessary for this all to be replaced as well?
If it helps, the patio is 3.3m x 3.8m. Another consideration is that the current patio is actually only 75mm below the bottom of the door sill, I understand that it should really be 150mm below the DPC (though I've not had damp issues arising so far as I can tell)
Thanks
If it helps, the patio is 3.3m x 3.8m. Another consideration is that the current patio is actually only 75mm below the bottom of the door sill, I understand that it should really be 150mm below the DPC (though I've not had damp issues arising so far as I can tell)