Morning. I've stripped the rear of my roof this week and re-felted and battened it. I now have a bit of a problem with the over hang on the apex. It seems as though the apex wall has moved out as I had a 25mm gap between my tiles before. Now there all back on I don't seem to have any overhang at the top and about 50mm at the bottom. They are interlocking tiles Marley Ludlow I think. Is this a problem anyone has seen before and how did you get over it. I've thought about maybe trying to use a dry verge system but not sure how it would work. Any advice would be great cheers
 
Best bet is take them off again then line the roof out with a chalk / dye line from top to bottom and from the left giving say 40mm over hang. then tile from the right again with 40mm as you tile pull the tiles open then as you go you will get closer and closer to your chalk lines. once your on the line then simply keep them there. easy. Of course I am assuming you have a good few metres of roof length..
 
Back
Top