I have walls on a basement that need finishing. Walls are internal and built up with thermalite blocks. I have to come in each side approx 25mm to level up with the stair case.
2 options
Sand and cement, then skim
Attach thin stud work to walls, plasterboard board over, and then skim
Which would be the best option in this case?