Hi All.
I need to do some additional floor levelling on some shallow dips in a floor that was smoothed with floor levelling compound a couple of years ago. The Floor will be covered with 4mm foam underlay and 10mm laminate when it is flat. There are no damp problems. Existing SLC is in good condition and was water based but I dont know what brand was used.
I have some Mapei 1210 to do the job but I was concerned about prepping the floor.
The areas that need doing are not large, 1m2 about 3mm deep.
would scuffing the floor then brushing and vacuuming be enough or should it be primed.
If priming is required would SBR diluted 4:1 be good or would neat SBR mixed with cement be better.
Should the 1210 SLC be poured before the primer is dry?
Cheers
Ian
I need to do some additional floor levelling on some shallow dips in a floor that was smoothed with floor levelling compound a couple of years ago. The Floor will be covered with 4mm foam underlay and 10mm laminate when it is flat. There are no damp problems. Existing SLC is in good condition and was water based but I dont know what brand was used.
I have some Mapei 1210 to do the job but I was concerned about prepping the floor.
The areas that need doing are not large, 1m2 about 3mm deep.
would scuffing the floor then brushing and vacuuming be enough or should it be primed.
If priming is required would SBR diluted 4:1 be good or would neat SBR mixed with cement be better.
Should the 1210 SLC be poured before the primer is dry?
Cheers
Ian