I understand I should allow around 1 day per mm of screed before I go ahead and lay a final floor finish. I wondered though if it's worth gradually turning up the underfloor heating to 'force dry' the screed and speed up the drying time?

Is this a known practice? If so, does it make much difference to drying times?
 
Using the UFH to dry the screed will almost certainly make no difference to the overall drying time of the floor, it just takes ages, about 4 weeks per inch of depth. We know this from experience when we had to repair a badly cemented floor before fitting a stickdown engineered wood, despite leaving the UFH on and despite being laid over a 20 year old slab, it still took nearly 3 months - as predicted - to dry enough to be able to bond the flooring.

When measuring for moisture, make sure you use a proper flooring damp meter like a protometer or hydrometer, eyesight is no use, and regulay damp meters will not measure the floor moisture content correctly.
 
Back
Top