Hi,
I am installing wet underfloor heating and upstairs I have been advised to surround pipes in a 25ml bed of 8:1 sand cement dry mix screed with ply above and insulation below.
Am I correct in thinking dry mix should remain as a powder or should I be adding water so it sets.
If a powder does it matter if the sand is a bit damp
Any advice would be much appreciated as I am pretty confused!!.