Shower Alcove Stud adjustment

Joined
12 Jul 2023
Messages
1
Reaction score
0
Country
United States
I am preparing a small alcove for a 4 piece Lyons prefab standing showe 32×32 the back wall has some molded in shelving that require the shower studs to have a 20" gap and mine are 16" on center. The stud I need to move appears to have a ceiling or attic joist attached to it. (See pictures)

How do I move this stud? The far right wall is an exterior wall if that matters at all. I'm imagining moving the stud and using 2×4 spacers to reattach the top joist?
 

Attachments

  • PXL_20230712_213740934~2.jpg
    PXL_20230712_213740934~2.jpg
    171 KB · Views: 44
  • PXL_20230712_213803335~2.jpg
    PXL_20230712_213803335~2.jpg
    258.9 KB · Views: 45
Back
Top