Hi All,
I really would appreciate advice on the following;
Bathroom was completely stripped back to bare brick. Shower area was created with a small partitioned wall for water pipes to hide behind. Dry lined with water resistant plaster board. Plaster board sealed prior to professional tiler coming in and tiling the 2 walls of the shower area.
Requested the tiler wait until the day after tile application to grout.
Left to dry >48 hours prior to sealing the grout. Left to dry for weeks because we were delayed fitting the rest of the shower. 2 glass panels fitted for the rest of the cubicle.
Plumbers fitted the actual shower, no problems.
Short time later water is seeping up in-between the [Karndean] tiles, tracked this back to corner where one glass panel meets the wall. Dried out for >3 days using a hair dryer. Some grout appeared darker than the rest, but upon inspection of the sealant it appeared there was a small gap. Pouring a cup of water on the area meant more water leaking. (No water marks on the downstairs ceiling).
After drying, sealed again and allowed to cure for >48hrs.
I have just tested the area and there is still water leaking!
Water now appears to be coming from behind the tiles. The very bottom, left hand side tile. Currently drying it out again whilst searching desperately for an answer.
There is no plumbing on this side of the shower. The only possible answer is the grout. I can't see any physical deterioration of the grout but this may be because it's wet. (again!! pfff).
Is there anything I can do without ripping the whole shower out?
P.S. I know ripping it all out is probably the go to answer but we really cannot face this after the bathroom taking nearly a year (long story!). Yes, very nervous that if it is indeed the grouts integrity that's shot we won't know how much of the other grout is also leaking.
I really would appreciate advice on the following;
Bathroom was completely stripped back to bare brick. Shower area was created with a small partitioned wall for water pipes to hide behind. Dry lined with water resistant plaster board. Plaster board sealed prior to professional tiler coming in and tiling the 2 walls of the shower area.
Requested the tiler wait until the day after tile application to grout.
Left to dry >48 hours prior to sealing the grout. Left to dry for weeks because we were delayed fitting the rest of the shower. 2 glass panels fitted for the rest of the cubicle.
Plumbers fitted the actual shower, no problems.
Short time later water is seeping up in-between the [Karndean] tiles, tracked this back to corner where one glass panel meets the wall. Dried out for >3 days using a hair dryer. Some grout appeared darker than the rest, but upon inspection of the sealant it appeared there was a small gap. Pouring a cup of water on the area meant more water leaking. (No water marks on the downstairs ceiling).
After drying, sealed again and allowed to cure for >48hrs.
I have just tested the area and there is still water leaking!
Water now appears to be coming from behind the tiles. The very bottom, left hand side tile. Currently drying it out again whilst searching desperately for an answer.
There is no plumbing on this side of the shower. The only possible answer is the grout. I can't see any physical deterioration of the grout but this may be because it's wet. (again!! pfff).
Is there anything I can do without ripping the whole shower out?
P.S. I know ripping it all out is probably the go to answer but we really cannot face this after the bathroom taking nearly a year (long story!). Yes, very nervous that if it is indeed the grouts integrity that's shot we won't know how much of the other grout is also leaking.