It's a semi detached house with private man hole and drains. The soil pipe is on the side of the building and a new side extension is being built.
A new manhole is also being built to move the drains and then connect to main manhole.
But for the soil pipe, I think there won't be enough drop. Do we box it in within the new extension? Ideally I would want to avoid it.
Would like to know how this problem is generally addressed. I have attached a picture showing the pipes and the manhole.
Green colored is the existing pipework for the man hole. Red circle is where the new manhole is being built.
Thanks
A new manhole is also being built to move the drains and then connect to main manhole.
But for the soil pipe, I think there won't be enough drop. Do we box it in within the new extension? Ideally I would want to avoid it.
Would like to know how this problem is generally addressed. I have attached a picture showing the pipes and the manhole.
Green colored is the existing pipework for the man hole. Red circle is where the new manhole is being built.
Thanks