Hi
I'd welcome some advice in regards to the slate roof verge detail required on my new garage build.
I'm clear on the setting out & fitting process for the battens & tiles it's just the detail of verge I'm a bit unclear on.
Would someone be so kind as to point me in the direction of a decent diagram or be able to give answers to my following questions.
FYI the gable ends are standard cavity block work which will externally rendered
The plan in my head currently is to fit slates as a cap along the gable (undercloak I think is the term??) on the on the top of the blockwork and overhang the gable by ~50mm
Thank you in advance for any advice
I'd welcome some advice in regards to the slate roof verge detail required on my new garage build.
I'm clear on the setting out & fitting process for the battens & tiles it's just the detail of verge I'm a bit unclear on.
Would someone be so kind as to point me in the direction of a decent diagram or be able to give answers to my following questions.
FYI the gable ends are standard cavity block work which will externally rendered
The plan in my head currently is to fit slates as a cap along the gable (undercloak I think is the term??) on the on the top of the blockwork and overhang the gable by ~50mm
a) I presume these should be sat on a bed of mortar?
b) should these also be mechanically fixed into the blockwork through the mortar?
c) should these slates span both leaves of the cavity effectivity acting as a cavity closer at the top?
b) should these also be mechanically fixed into the blockwork through the mortar?
c) should these slates span both leaves of the cavity effectivity acting as a cavity closer at the top?
d) Should the breathable membrane be cut to finish flush with edge of these undercloak tiles?
e) If the membrane is suppose to come to the edge then does the verge mortar sit on top of the membrane?
f) Should the verge slates be laid on a bed of mortar as they are laid or just the gap between the undercloak and the slate pointed up after its all been laid?
e) If the membrane is suppose to come to the edge then does the verge mortar sit on top of the membrane?
f) Should the verge slates be laid on a bed of mortar as they are laid or just the gap between the undercloak and the slate pointed up after its all been laid?
Thank you in advance for any advice