- Joined
- 5 Dec 2012
- Messages
- 929
- Reaction score
- 13
- Country
I want to install a 3m long and 50cm wide flower bedding made out of sleepers l
Is the best order;
1. Install sleepers (on top of compacted MOT and concrete them in)
2. Install aco drain (I am going to put this directly next to the sleepers) and also install patio edging
3. Put down and install remaining hardcore to correct level
4. Install paving
cheers
Is the best order;
1. Install sleepers (on top of compacted MOT and concrete them in)
2. Install aco drain (I am going to put this directly next to the sleepers) and also install patio edging
3. Put down and install remaining hardcore to correct level
4. Install paving
cheers