Hello,
A plumber has just installed a new waste pipe for a new bathroom which runs approx. 7 meters. I was skeptical about his work so thought i'd have a look at what was done. The first 1 - 1.5 meters of the pipe has a slight upward incline on it (tested with a spirit level) before it declines again.
When i spoke to the plumber he said that was fine as long as the correct decline was over the full length of the pipe.
Is this right? I always thought there should be no upward incline at any point on the soil pipe...?
Thanks
A plumber has just installed a new waste pipe for a new bathroom which runs approx. 7 meters. I was skeptical about his work so thought i'd have a look at what was done. The first 1 - 1.5 meters of the pipe has a slight upward incline on it (tested with a spirit level) before it declines again.
When i spoke to the plumber he said that was fine as long as the correct decline was over the full length of the pipe.
Is this right? I always thought there should be no upward incline at any point on the soil pipe...?
Thanks