I'm looking at adding solar panels to our roof. It's clay-tiled, no issues at present but may need attention within the likely lifespan of the panels - the hip tiles probably need replacing soon, and I'd like to have the chimneys removed at some point.
The obvious answer would be to do the work before the panels are added. But the solar surveyor said it's not a big deal as they can be unplugged and removed then put back in future if necessary.
Is this true or salesman-speak?
The obvious answer would be to do the work before the panels are added. But the solar surveyor said it's not a big deal as they can be unplugged and removed then put back in future if necessary.
Is this true or salesman-speak?