Hi,
Im doing 3m x 5m steel shed base in 2 stages
Stage 1 was strip foundation.
Shed was put, now I want to pour floor inside.
I imagined I will lay out DPM and tape up against the walls and pour concrete over.
The problem I have is metal shed profile. Its hollow inside and 45mm high which I about the hight over foundation I wanted to pour.
I cannot figure out how to lay out plastic.
I don't want to leave it hollow so I can stand eg shelf there and I wanted to seal to the wall to keep moisture away so I was thinking to put DPM inside and pour 1cm over profile height like this
Would you have any better ideas?
Thanks
Im doing 3m x 5m steel shed base in 2 stages
Stage 1 was strip foundation.
Shed was put, now I want to pour floor inside.
I imagined I will lay out DPM and tape up against the walls and pour concrete over.
The problem I have is metal shed profile. Its hollow inside and 45mm high which I about the hight over foundation I wanted to pour.
I cannot figure out how to lay out plastic.
I don't want to leave it hollow so I can stand eg shelf there and I wanted to seal to the wall to keep moisture away so I was thinking to put DPM inside and pour 1cm over profile height like this
Would you have any better ideas?
Thanks