Hi all,
I'm doing a 2m wide patio around a new extension. There is a 5m wide bifold which needs a 100mm step down onto the finished level of the patio.
I have put down the mot and have to compact it, but I'm wondering about footings for the step.
Pavingexpert says you can lay brick and flag on top of the patio slabs, but I'm wondering if I should put down a mortar bed in the shape of the step first, and butt the patio slabs up to the step riser. The mot will be the foundation.
What's the consensus? A footing would surely be OTT for a single brick riser? Is the mot compacted ok for a footing?
Should add I'm on chalk...
I'm doing a 2m wide patio around a new extension. There is a 5m wide bifold which needs a 100mm step down onto the finished level of the patio.
I have put down the mot and have to compact it, but I'm wondering about footings for the step.
Pavingexpert says you can lay brick and flag on top of the patio slabs, but I'm wondering if I should put down a mortar bed in the shape of the step first, and butt the patio slabs up to the step riser. The mot will be the foundation.
What's the consensus? A footing would surely be OTT for a single brick riser? Is the mot compacted ok for a footing?
Should add I'm on chalk...