I'm looking for some advice.
I have a project. The build is with ICF Nudura.
A company has issued drawings for me and proposed a private building control for a full plan application
I show the most detailed drawing I have.
Now at the project start I am told I should not have trench foundations. As well I'm told I should have a drainage market and proposed on the drawing.
Can someone advice?
I spent money to have trenches filled back as BCO was not happy with digging this close to the tree (like 1 m) and he said if we go to 2.4m depth the question is of the stability of the trees which are not mine. I have bought rebar to reinforce the foundation which is not on design but speaking to BCO over the phone it was suggested. I'm being told by the drawing provider that is normal stuff to have design changes as you start to build.
I have a project. The build is with ICF Nudura.
A company has issued drawings for me and proposed a private building control for a full plan application
I show the most detailed drawing I have.
Now at the project start I am told I should not have trench foundations. As well I'm told I should have a drainage market and proposed on the drawing.
Can someone advice?
I spent money to have trenches filled back as BCO was not happy with digging this close to the tree (like 1 m) and he said if we go to 2.4m depth the question is of the stability of the trees which are not mine. I have bought rebar to reinforce the foundation which is not on design but speaking to BCO over the phone it was suggested. I'm being told by the drawing provider that is normal stuff to have design changes as you start to build.