- Joined
- 13 May 2019
- Messages
- 79
- Reaction score
- 5
- Country
Hi all.
We're coming to the end of our garden project and the last job is getting artificial grass purchased and installed.
Because of all the other work, we're left with approx 3 ton of a mixture of sharp sand and aggregate mix of gravel and sand.
Would mixing all this left over mound be useful for the sub base (on top of soil) if wacker plated?
Don't to do a bodge job but it would be so much easier than barrowing 3 ton to a skip.
Many thanks in advance.....
Alway get great advice on the forums.
Andy
We're coming to the end of our garden project and the last job is getting artificial grass purchased and installed.
Because of all the other work, we're left with approx 3 ton of a mixture of sharp sand and aggregate mix of gravel and sand.
Would mixing all this left over mound be useful for the sub base (on top of soil) if wacker plated?
Don't to do a bodge job but it would be so much easier than barrowing 3 ton to a skip.
Many thanks in advance.....
Alway get great advice on the forums.
Andy