Old bricklayer and general building back in the day looking for some advice on laying a new driveway.
Looking to have a stab myself, I know it won't be perfect and all that but feel its doable.
Roughly 45m2 previously had sets down and looking to tarmac.
looking for some advice.
Presumably we need to re work the hardcore and level, what's best a roller or whacker plate?
Should you then lay a edging coarse of sets, roughly leaving 70mm for the tarmac.
How to get the tarmac level, should you screed or flute rakes?
How much higher should you lay the tarmac above the sets before rolling with the expectation it will compress?
If you see or get some hollows or high spots, can it reworked or simply keep rolling until the area levels itself?
Do you have to spray with water before touching it with a roller or wacker.
And lastly what is the worktime before it becomes unworkable.
Any constructive help would be welcome.
Looking to have a stab myself, I know it won't be perfect and all that but feel its doable.
Roughly 45m2 previously had sets down and looking to tarmac.
looking for some advice.
Presumably we need to re work the hardcore and level, what's best a roller or whacker plate?
Should you then lay a edging coarse of sets, roughly leaving 70mm for the tarmac.
How to get the tarmac level, should you screed or flute rakes?
How much higher should you lay the tarmac above the sets before rolling with the expectation it will compress?
If you see or get some hollows or high spots, can it reworked or simply keep rolling until the area levels itself?
Do you have to spray with water before touching it with a roller or wacker.
And lastly what is the worktime before it becomes unworkable.
Any constructive help would be welcome.