- Joined
- 12 Apr 2020
- Messages
- 466
- Reaction score
- 0
- Country
I did my basins 32mm waste pipe earlier, 3 solvent weld joints. The pot said wait 15 mins before handling, nothing about testing.
I just ran some water down it with a hose, about 1.5 hrs/2 hrs after doing the pipes.
Is this enough? The internet says lots of different stuff, some saying 24 hours! I was only running low pressure for about 10 mins before I worried!
These pipes are going to be under the floor so I'm a bit paranoid!
They seemed totally dry and set 10 mins after doing them
I just ran some water down it with a hose, about 1.5 hrs/2 hrs after doing the pipes.
Is this enough? The internet says lots of different stuff, some saying 24 hours! I was only running low pressure for about 10 mins before I worried!
These pipes are going to be under the floor so I'm a bit paranoid!
They seemed totally dry and set 10 mins after doing them