Hi to all plumbers out there. Looking to confirm my understanding of my underfloor heating design as I'm getting conflicting info from my plumber, my electrician, and my underfloor heating tech support
I have a system boiler with an unvented cylinder "behind" a 2 port valve, a 4 zone underfloor heating system in the ground floor behind its own 2 port valve, and another 4 zone UFH system in the first floor again behind its own 2 port valve. My understanding is that a programmer of a sorts will control the overall system by turning on and off the valves depending on a clock I set for what times I want heating and hot water on as well as input from the cylinder thermostat, is this correct?
Then the two UFH systems have their own thermostats for each zone so they control what they do with the hot water they receive accordingly.
So in terms of connections:
- all the two port valves have to connect to the main programmer
- main programmer connects to the boiler as well
- UFH wiring centres seem to require connections to the boiler "enable" as well but this is the bit I'm struggling to fit with the rest.
Can someone explain to me how everything fits together in simple terms please and what I'm missing from the above?
Thanks in advance!
I have a system boiler with an unvented cylinder "behind" a 2 port valve, a 4 zone underfloor heating system in the ground floor behind its own 2 port valve, and another 4 zone UFH system in the first floor again behind its own 2 port valve. My understanding is that a programmer of a sorts will control the overall system by turning on and off the valves depending on a clock I set for what times I want heating and hot water on as well as input from the cylinder thermostat, is this correct?
Then the two UFH systems have their own thermostats for each zone so they control what they do with the hot water they receive accordingly.
So in terms of connections:
- all the two port valves have to connect to the main programmer
- main programmer connects to the boiler as well
- UFH wiring centres seem to require connections to the boiler "enable" as well but this is the bit I'm struggling to fit with the rest.
Can someone explain to me how everything fits together in simple terms please and what I'm missing from the above?