I am about to board out a cold roofed room. I have 75mm PIR between the rafters and another 75mm layer of PIR under the rafters.
Will the additional layer of PIR on the warm side be sufficient for vapour control - or do I need to still attach a VCL film? If it's the latter, what is the accepted way of attaching this VCL to the PIR?