We've specced up needing 5T of gravel for a feature (already built) to be dropped loose a dozen or so metres away. I have absolutely no idea how long that should take a reasonably fit but non-tradesman to shift, can anyone with experience tell me how long they reckon they'd take or how many barrow-fulls that is roughly? Trying to guesstimate how long it will be sat in the way since I'd probably only have time in the evenings to work through it.
Ta.
Ta.