- Joined
- 26 Nov 2017
- Messages
- 66
- Reaction score
- 0
- Country
Hi,
I am building a half stud wall that I will be covering with 12mm ply and then plasterboard, then adding skirting once it’s had a skim. I was wondering if I need to leave a gap at the bottom of either covering like you would on a masonry wall? I would think not to leave a gap for the ply, but maybe an inch or two for the plasterboard?
Thanks!
I am building a half stud wall that I will be covering with 12mm ply and then plasterboard, then adding skirting once it’s had a skim. I was wondering if I need to leave a gap at the bottom of either covering like you would on a masonry wall? I would think not to leave a gap for the ply, but maybe an inch or two for the plasterboard?
Thanks!