Any idea what we should expect to pay (before VAT) on a rewire?
Bristol
Terraced, 1980 Victorian house
2 Bed
Floorboards that are exposed (no carpet)
All belongings boxes and moving out to avoid getting in the way/speeding things up
No access to roof space in bathroom
Kitchen
Double sockets = 4
Cooker = 1
Gas combi Boiler = 1
Cooker hood supply but not installation of hood = 1
Sockets downstairs
Double = 11
Outdoor double = 1
Sockets upstairs
Double = 9
Lights downstairs
Pendant lights = 5
Spotlights = 8 (just installed so will just need to be connected to the new ring
Lights upstairs
Pendant lights = 3
LED strip = 1 in bathroom
Spotlights = 2 in bathroom
Wall lights = 2 in bathroom
Fire alarms
Wired in ring, 2 smoke (1 on each floor), 1 heat in kitchen
Other
New control unit
Gas & water services bonding
Bristol
Terraced, 1980 Victorian house
2 Bed
Floorboards that are exposed (no carpet)
All belongings boxes and moving out to avoid getting in the way/speeding things up
No access to roof space in bathroom
Kitchen
Double sockets = 4
Cooker = 1
Gas combi Boiler = 1
Cooker hood supply but not installation of hood = 1
Sockets downstairs
Double = 11
Outdoor double = 1
Sockets upstairs
Double = 9
Lights downstairs
Pendant lights = 5
Spotlights = 8 (just installed so will just need to be connected to the new ring
Lights upstairs
Pendant lights = 3
LED strip = 1 in bathroom
Spotlights = 2 in bathroom
Wall lights = 2 in bathroom
Fire alarms
Wired in ring, 2 smoke (1 on each floor), 1 heat in kitchen
Other
New control unit
Gas & water services bonding