I am doing an attic conversion. I have wood for general stud work and I have decided to batten the gable walls 50 x 35 treated.
Is 2 weeks generally the standard to acclimate the wood to the space?
Is it overkill to do the verticals in 2 or 3 pieces with a few mm gap, (vertical spans 2.36m) or does the block wall win regardless and wood contraction doesn't matter?