Workshop update

Joined
7 Feb 2008
Messages
164
Reaction score
0
Country
United Kingdom
A little while ago I posed some pictures of the start of my workshop.
Its now almost finished, so I thought it time for an update:

As all the brickwork was finished, I painted the inside and the floor, and had my lathe dropped into place:

IMG_0094.jpg



IMG_0102.jpg



IMG_0105.jpg



IMG_0106.jpg


So next up, it was time to get the roof done, I had the chippy from my extension knock the roof up one weekend, then I tiled it myself.

IMG_0118.jpg



IMG_0119.jpg


IMG_0120.jpg



IMG_0132.jpg


Still got to cut the edge tiles, and do the verge and mortar the ridge tiles in place, but i'll do that shortly.

The reason there is a hole in the one gable end is a copy of someones workshop on here, to allow me to store long bits in the roof space, a door is being made up for it but I havent sourced any hinges yet.

I've also started to wire it up, and fill it up.

IMG_0148.jpg

IMG_0149.jpg

IMG_0150.jpg


Got my bargain £15 installed now too.
Metal clad sockets, and nice 20mm conduit.
Also wiring a few E-stops which will cut the power off to all sockets and the lathe, bandsaw, compressor etc....

IMG_0147.jpg



Still lots to do though :)
 
Back
Top