I have a timber frame structure mounted on concrete blocks around the perimeter, which are bedded on a concrete base.The concrete base has a membrane but is cut off flush.
as i'm doing a solid floor inc Ufh made up of 150mm celotex , a seperation layer then UFH stapled on top , before a 75mm...