Boarding floor on damp concrete

What is underneath the concrete?

you should allow 1 month per inch of concrete drying time. This time of year possibly more.
I'd piped for underfloor heating? If so get that connected up and running at a low temperature.
 
It's screed with membrane under, on top of insulation on top of concrete with membrane under, on top of type 1, all wacked down.
Oof, I'd have swapped that concrete out for insulation and put UFH in the screed
 
What is underneath the concrete?

you should allow 1 month per inch of concrete drying time. This time of year possibly more.
I'd piped for underfloor heating? If so get that connected up and running at a low temperature.
Hi F,
See #15