Knowing where the soffit stops and epdm

A little further now and at the point where it all meets.
I'm concerned about water getting umder epdm at this point as i only habe one Eaves tile to cover this bit.
Does it all look like its going in the right direction?
I know ive ashed before but should i put any lead here or is it not needed?
Images are of where the layboard is a bit high and roof with cheek fascia meet. Bird nest protection in too. (thanks). Other image is of where i think the rubber should go ( shown by a small off cut) was told i shouldn't glue epdm to tiles though. So what should it be fixed to?
 

Attachments

  • DSC_1150.JPG
    DSC_1150.JPG
    132.4 KB · Views: 139
  • DSC_1149.JPG
    DSC_1149.JPG
    221.3 KB · Views: 132
  • DSC_1148.JPG
    DSC_1148.JPG
    259.5 KB · Views: 126
  • DSC_1147.JPG
    DSC_1147.JPG
    216.2 KB · Views: 135
@chappers. Is this looking like you explained. Put a lead apron in and will cut rubber to dress over. Will put un-cured rubber at cut overhang. thanks
 

Attachments

  • DSC_1165.JPG
    DSC_1165.JPG
    156.3 KB · Views: 127
  • DSC_1164.JPG
    DSC_1164.JPG
    168.3 KB · Views: 123
Back
Top