when all the laths are removed is a good time to run any pipework in the wall before boarding. saves boxing in at the end if you can get your hot and colds in just the right places.
You won't believe what a nightmare you just saved me from! I was about to board up the floor, and plasterboard the wall, and hadn't even considered the pipework. Which was very silly, as I'm moving the toilet a few feet. I've never done this before so could easily have missed it.
Thank you! I just ordered a load of speed fit stuff and solvent weld waste pipe bits. I had to youtube a few things but tomorrow I'll extend and run everything in the wall cavity. Phew!