Yep, probably a good solution then. Otherwise you'd need to either raise the side branch or lower everything downstream, both of which sound like lots of work.
I had to replace everything downstream anyway, as it was all junk, so could have used a standard chamber with some extra digging, putting the pipework and sewage treatment plant a bit lower. If I'd known these chambers were a bit rubbish I'd have done this.
I found that luxury bog roll clogged it, cheap stuff is OK.
I had to replace everything downstream anyway, as it was all junk, so could have used a standard chamber with some extra digging, putting the pipework and sewage treatment plant a bit lower. If I'd known these chambers were a bit rubbish I'd have done this.
I found that luxury bog roll clogged it, cheap stuff is OK.