Oversite to Suspended timber ground floor

Cheers for that. Although I spent about 25yrs on site it was all on civils & r.c. frame flats/offices etc so house construction is a bit of blank spot!
 
There wont be a problem with the oversite being lower than adjacent ground levels if the oversite is permeable. Concrete will hold surface water, so is normally required to be higher than adjacent ground
 
Back
Top