Morning, I have just built a second storey extension on top of a ground floor extension (which was done 3 years ago).
I’ve knocked through in to the existing bedroom and the new floor is 20mm higher than the existing. I don’t want it ramped, feathered or existing raised creating a step at the door bar.
So my question is, what is the best way to take 20mm of the joists and noggins on the new extension floor?
I’ve knocked through in to the existing bedroom and the new floor is 20mm higher than the existing. I don’t want it ramped, feathered or existing raised creating a step at the door bar.
So my question is, what is the best way to take 20mm of the joists and noggins on the new extension floor?