There has been some light rain this morning. The area under where the old square bit of downpipe is joined by the new, vertical round pipe is dry. Not a certainty that that joint ok (bigger volume of rains could see water going down the downpipe and then overflow from the square opening), just an indication that the join is OK.
In the attached pictures you can see that there´s actually a slate DPC; further, there is a plastic DPC inside as can be seen (last picture), but that sits only on the bricks/rocks where the joists are sat on. That section of bricks/rocks is an extra layer of bricks next to the internal skin (or maybe it is simply the foundation? I have never ripped up a ground floor before). As it can be seen in that last picture, the joists are sometimes even longer than the strip of DPC, totally useless.
I also attached pictures of the internal bay and a wider angle of the corner mostly affected by damp.
The outside soil level is 1 to 3 cm higher than the internal joist level, at measured in the bay window. I think this is a signal that I should start digging!
In the attached pictures you can see that there´s actually a slate DPC; further, there is a plastic DPC inside as can be seen (last picture), but that sits only on the bricks/rocks where the joists are sat on. That section of bricks/rocks is an extra layer of bricks next to the internal skin (or maybe it is simply the foundation? I have never ripped up a ground floor before). As it can be seen in that last picture, the joists are sometimes even longer than the strip of DPC, totally useless.
I also attached pictures of the internal bay and a wider angle of the corner mostly affected by damp.